南部半導體走廊 · AI 電力入口Southern Taiwan Semiconductor Corridor · The AI Power Gateway

南部半導體走廊上
兩塊已持有的 AI 資料中心場址
Two owned AI data-centre sites
on Taiwan's southern semiconductor corridor

嘉義・22.8kV 用電計畫書已核准・可即時供電、貨櫃式 AI 機櫃最快 1 個月內進場 | 路竹・161kV 特高壓申請中・即將可供電Chiayi · 22.8kV utility plan approved · power available now, containerised AI racks on site in as little as a month | Luzhu · 161kV EHV under application · power coming soon

Utility Plan
已核准Approved
嘉義・台電用電計畫書・會談現場查驗Chiayi · Taipower utility plan · verify in person
Land Held
萬坪級10,000+ ping
每塊基地・皆已持有Per site (3.3+ ha) · both sites owned
AIDC Capacity
30 MW+
兩地各 30MW 以上・可再擴充30MW+ at each site · expandable
Rack Power
800 VDC
架構規劃中・對接次世代高功耗機櫃Architecture in planning · for next-gen high-power racks
Site Overview

兩基地場址速覽Two sites at a glance

找場地的人只需要這幾個數字。電力、進場與綠電都標明目前狀態;各基地頁有更多細節。The numbers a site-selection team screens on, with current status shown for power, move-in and renewables. More detail on each site page.

嘉義高鐵基地Chiayi HSR Site
路竹科學園區基地Luzhu Science Park Site
土地面積Land Area
萬坪級10,000+ ping (3.3+ ha)
萬坪級10,000+ ping (3.3+ ha)
土地權屬Land Title
已持有Owned
已持有Owned
供電電壓Grid Voltage
22.8kV22.8kV
161kV 特高壓161kV EHV
用電計畫書Utility Plan
已核准(2026 年 7 月)Approved (Jul 2026)
申請中Under application
容量Capacity
30MW 以上30MW+
30MW 以上30MW+
最快供電Earliest Power
可即時供電Available now
即將可供電(時程洽談時說明)Coming soon (timing shared in discussions)
最快可進場Earliest Move-in
1 個月內(貨櫃式 AI 機櫃)Within 1 month (containerised AI racks)
洽談時提供Shared in discussions
綠電Renewables
光電棚已建置,待台電併聯Solar carport built, awaiting grid connection
光電棚建置中Solar carport under construction
區位Location
鄰近嘉科台積電 AI 封裝廠與高鐵嘉義站Near TSMC's AI packaging fab in Chiayi Science Park and THSR Chiayi
高雄路竹科學園區Luzhu Science Park, Kaohsiung
合作模式Engagement Model
依客戶需求規劃Tailored to client needs
依客戶需求規劃Tailored to client needs
場址檔案 →Site profile →
場址檔案 →Site profile →
Two Strategic Sites

兩大基地,卡位南部半導體走廊Two sites on Southern Taiwan's semiconductor corridor

從鄰近嘉科台積電 AI 封裝廠的嘉義,到路竹科學園區,雙基地形成 AI 算力與綠能運輸的南部軸線。From Chiayi, near TSMC’s AI packaging fab, to Luzhu Science Park — a southern axis for AI compute and green logistics.

國際動線Getting Here|桃園國際機場 → 高鐵 → 嘉義基地,高鐵車程約 1 小時多TPE Airport → THSR → Chiayi site, just over an hour on the HSR|路竹基地位於高雄路竹科學園區Luzhu site in Kaohsiung's Luzhu Science Park
Real Power, Verifiable

大多數場域在談硬體,
我們拿得出電力證明。
Most sites talk hardware.
We show our utility approval.

在 AI 基礎設施市場,「有沒有台電核准的用電計畫書」是實幹與概念的分水嶺。我們選擇把證明攤開。In AI infrastructure, an approved utility plan is the line between real and conceptual. We choose to show ours.

供電規格Grid Supply嘉義 22.8kV(用電計畫書已核准)・高雄路科 161kV 特高壓(申請中)Chiayi 22.8kV (utility plan approved) | Kaohsiung Luzhu 161kV EHV (under application)
AIDC 容量AIDC Capacity30MW 以上,可再擴充(嘉義用電計畫書已核准、路竹申請中;實際容量依客戶機櫃需求評估,於會談時說明)30MW+, expandable (Chiayi utility plan approved, Luzhu under application; actual capacity sized to your racks and discussed in person)
機櫃供電架構Rack Power800V 高壓直流架構800V HVDC architecture(規劃中,對接次世代高功耗機櫃) (in planning, for next-gen high-power racks)
散熱規劃Cooling浸沒式與晶片直接液冷(D2C)雙方案(場域設計規劃中);浸沒式依散熱設備廠商測試數據,PUE 可低至 1.02(非本基地實測)Immersion and direct-to-chip (D2C) liquid cooling (site design in planning); vendor test data shows immersion reaching PUE as low as 1.02 (not measured at our sites)
綠電RenewablesRE100 光電停車棚——嘉義已建置完成待台電併聯,路竹建置中;儲能規劃中RE100 solar canopies — Chiayi built and awaiting grid interconnection; Luzhu under construction; storage in planning
第一期Phase 1嘉義 3–6MW 液冷示範區(規劃中)Chiayi 3–6MW liquid-cooled demo zone (in planning)

信任證明清單Proof Checklist

已確認的事項據實揭露,規劃中的事項誠實標示——這是我們與「概念案」的差別。What exists is disclosed; what is planned is labelled. That is the difference between us and a concept deck.
✓ 嘉義基地台電用電計畫書核准(核准容量與文件於會談現場提供查驗)Taipower utility plan approved at the Chiayi site (approved capacity and documents presented in person for verification)已取得Secured
✓ 兩基地土地權屬Land title for both sites已取得Secured
◌ 電機技師 800V 直流架構概念單線圖Conceptual single-line diagram for the 800V DC architecture by a licensed electrical engineer規劃中In planning
◌ 第一期 3–6MW 液冷示範區(嘉義)Phase-1 3–6MW liquid-cooled demo zone (Chiayi)規劃中In planning
Partnership

合作方式Ways to work with us

場地合作模式(租地/代建/合資):依客戶需求規劃。以下兩類夥伴現階段開放洽談。Site engagement models (land lease / build-to-suit / JV): tailored to client needs. The two partner types below are open for discussion now.

Compute Platforms

算力平台/AI 公司Compute Platforms & AI Companies

嘉義第一期 3–6MW 液冷示範區規劃中,現階段開放預約進駐與 PoC 需求洽談。嘉義用電計畫書已核准,可據此規劃部署時程;需要更快上線者,可另採貨櫃式一站式 AI 機櫃,最快 1 個月內進場。The Phase-1 3–6MW liquid-cooled demo zone at Chiayi is in planning; we are taking reservations and PoC enquiries now. Chiayi's utility plan is approved, so deployment timing can be planned against it; for a faster go-live, turnkey containerised AI racks can be on site in as little as a month, as a separate option.

洽談進駐與 PoC →Discuss Hosting & PoC →
Rack, Cooling & Power Vendors

設備商/ODMEquipment Vendors & ODMs

已與散熱設備廠商建立合作,提供機櫃與散熱系統的選型與代購。800V 高壓直流架構聯合驗證與展示場域規劃中。Partnerships with cooling-equipment vendors are in place; we handle rack and cooling selection and procurement. An 800V HVDC joint-validation and showcase site is in planning.

技術合作洽談 →Discuss Tech Partnership →
The Real Bottleneck

最新的 AI 機櫃到貨了,
電力卻還在排隊。
The newest AI racks have arrived.
The power is still in the queue.

這是今天全球 AI 基礎設施最真實的瓶頸:硬體以月為單位演進,電力卻以年為單位核准。This is the real bottleneck of AI infrastructure today: hardware evolves in months, while power is approved in years.

01 — 等電三年01 — The 3-Year Wait

20MW 以上大容量,從頭申請約需三年20MW+ capacity takes about 3 years to secure from scratch

特高壓用電須經台電區域電網衝擊評估,計畫書送審、變電設施建置一路走完,時間以年計。容量較小的案件通常較快,20MW 以下最快可在半年內取得。Extra-high-voltage service requires grid-impact review, plan approval, and substation build-out — measured in years. Smaller cases move faster: under 20MW can be secured in as little as six months.

02 — 有櫃無電02 — Racks Without Power

新一代高功耗機櫃,插不上電Next-gen racks with nowhere to plug in

新一代高功耗液冷機櫃陸續到貨,卻因場域電力未到位,只能在倉庫折舊;次世代更將走向 800V 高壓直流。New high-power liquid-cooled racks keep arriving — and keep depreciating in warehouses waiting for power; the next generation moves to 800V DC.

03 — 時間折舊03 — Time Depreciation

晶片跌價快,等待就是成本Chips lose value fast; waiting is the cost

算力硬體的價值隨時間快速遞減。提早部署一年,就是多賺一輪算力財;晚一年,就是純損失。Compute hardware decays in value quickly. Deploying a year earlier means an extra cycle of revenue; a year later is pure loss.

AI 機櫃世代更替很快,一站式機櫃被視為下一步的趨勢;已經蓋好、或照舊規格規劃中的機房,可能得面對要不要改規格。我們的 AIDC 尚未動工,可以直接依最新規格規劃——還沒蓋,反而沒有包袱。AI rack generations turn over fast, and turnkey racks are widely seen as the next step; data halls already built, or planned to an older spec, may have to decide whether to re-specify. Our AIDC has not broken ground, so it can be planned to the latest spec from day one — nothing built yet, so nothing to retrofit.

嘉義基地的用電計畫書已經核准。
貨櫃式 AI 機櫃最快 1 個月內進場,不必從頭等三年。
Chiayi’s utility plan is already approved.
Containerised AI racks can be on site in as little as a month — not a three-year wait.
索取部署時程評估 →Get a Deployment Timeline →
AIDC Services

我們為 AIDC 客戶提供的三項服務Three services for our AIDC customers

不只是租給您一塊空間。從機櫃可用的電源規格、設備選型與採購,到把您的算力接上國際需求——我們把「在台灣部署 AI 算力」這件事的三段摩擦一次收斂。More than leased space. From rack-ready power specs to equipment sourcing to connecting your compute with global demand — we remove the three points of friction in deploying AI compute in Taiwan.

01

800V 高壓直流電源800V DC Power for High-End Racks

規劃提供高階算力機櫃所需的 800V 電源架構,讓次世代高功耗機櫃不必為了遷就舊機房電力上限而降規使用。We are planning the 800V power architecture high-end compute racks require — so next-gen racks need not be downgraded to fit an old hall’s power ceiling.

機櫃側 800V 高壓直流供電架構800V HVDC rack-side distribution 嘉義 22.8kV 用電計畫書已核准;高雄路科 161kV 特高壓(申請中)Taipower-approved 22.8kV at Chiayi; 161kV EHV at Luzhu (under application) 浸沒式/D2C 液冷配套,有助機櫃維持滿載、不降頻,降低單位算力電費Immersion / D2C liquid cooling — helps racks hold full load without throttling, lowering cost per unit of compute
800V 電源架構規劃中800V architecture in planning
02

機櫃與散熱系統整套採購Rack & Cooling-System Sourcing

客戶只要決定要跑什麼算力。尚未確定規格時,我們先提供各型算力機櫃與散熱設備的型錄協助選型;需求確定後依實際需求報價,客戶下單並支付訂金後由我們代為採購,設備直接進駐本基地運轉。You decide what compute to run. If the specification is still open, we start with catalogues of rack and cooling options to help you choose; once the requirement is fixed we quote against it, procure on your behalf after the deposit, and the equipment goes straight into service at our site.

型錄選型 → 依需求報價 → 付訂後代為採購 → 進駐本基地運轉Catalogue selection → quotation → procurement after deposit → deployed at our site 浸沒式與晶片直接液冷(D2C)兩種方案皆可供應;已與合作的散熱設備廠商談妥優惠採購條件Both immersion and direct-to-chip (D2C) cooling available; preferential procurement terms agreed with our partner vendor 採客戶確認後代購制,不預先備貨,避免規格未定即壓資金Procured only against a confirmed order — no speculative stock, no capital tied up before the spec is settled 依算力密度與功耗反推規格,並與場域規劃中的 800V 電力、冷卻條件整合驗證Spec derived from your density and power profile, validated against the site’s planned 800V power and cooling envelope
服務提供中Available
03

國際算力需求對接Global Compute Offtake Matching

規劃協助進駐本基地的客戶對接國外算力需求方,讓機櫃裡的算力以實際使用量計費產生收入,而不是空轉等待。We plan to connect customers hosted at our sites with overseas compute demand, so the capacity in your racks can earn usage-based revenue instead of sitting idle.

媒合海外 AI 平台與模型服務商的算力需求Matching demand from overseas AI platforms and model providers 以推論用量(token)計費的收入模式Revenue billed on inference usage (token-based) 用量與收益報表,收入來源可追溯Usage and revenue reporting with traceable revenue sources
合作洽談中In discussion
合作廠商設備Partner vendor
合作散熱設備廠商之晶片直接液冷(D2C)系統實機畫面。冷卻迴路與分歧管配置示意,非本基地現地設備。Actual footage of the partner vendor’s direct-to-chip (D2C) liquid-cooling system. Coolant loop and manifold arrangement shown for reference — not equipment installed at our sites.
合作廠商設備Partner vendor
合作廠商機櫃與散熱設備 Partner vendor rack and cooling equipment
合作廠商之機櫃與散熱系統實機。我們以此為選型基準,協助客戶完成整體機櫃、散熱系統與電源模組的規格確認與採購。Racks and cooling from the partner vendor. We use these as the sourcing baseline when specifying and procuring a customer’s complete rack, cooling, and power package.
Green Logistics

您的 Scope 3,從這裡開始。Your Scope 3 starts here.

鎖定嘉義高鐵・路科・南科・嘉科半導體供應鏈走廊。從員工電動車通勤到貨物運輸,建置可稽核的綠能運輸基礎設施;完成後將每月為國際企業產出無紙化 ESG 報告,支援 Scope 3 盤查與減量佐證。Aimed at the semiconductor supply-chain corridor around THSR Chiayi, Luzhu, Southern Taiwan Science Park (STSP) and Chiayi Science Park. From employee EV commuting to freight, we are building auditable green-mobility infrastructure; once complete it will issue paperless monthly ESG reports for multinational clients — supporting Scope 3 accounting and reduction evidence.

P

大貨車停車月租Truck Parking

路科大貨車停車場域,月租、夜間停放與車隊調度。Monthly truck parking, overnight bays, and fleet staging at Luzhu.

建置中Under construction
⚡

大貨車快充Truck Fast Charging

快充樁、離峰充電排程與 EMS 能源管理。Fast chargers, off-peak scheduling, and EMS energy management.

建置中Under construction
☀

RE100 光電自發自用RE100 Solar Self-Consumption

太陽能停車棚發電,規劃完整記錄充電度數與用電流向。Solar canopies, with generation and charging flows to be fully recorded.

嘉義待併聯・路竹建置中Chiayi awaiting grid tie · Luzhu under construction
EV

員工電動車通勤充電Employee EV Commute Charging

鄰近科學園區大廠員工自駕電動小客車,於本場域充電;充電度數與通勤里程自動歸戶,直接對應 Scope 3 類別 7。平台介面已完成,尚待與充電樁硬體整合。Employees of nearby science-park manufacturers charge their own EVs on site; kWh and commute mileage are attributed automatically, mapping directly to Scope 3 Category 7. The platform interface is complete, pending integration with the charger hardware.
規劃中In planning

📊

每月無紙化 ESG 報告Paperless Monthly ESG Report

通勤與運輸資料每月自動彙整:車牌×充電度數×里程×排放係數。平台介面已完成,待與充電樁整合後開始供應;規劃每月固定將電子報告寄送至企業指定信箱,供 Scope 3 盤查引用。Commuting and freight data compiled monthly — number plate × kWh × mileage × emission factors. The platform interface is complete and will go live once charger integration is done; the electronic report is planned to be emailed to the client’s designated inbox on a fixed monthly cycle for Scope 3 reporting.
規劃中In planning

Request Site Package

索取場址資料Request the Site Package

留下聯絡方式,我們提供兩基地的完整場址資料(精確面積與區位、電力核准狀態、時程),並安排實地參訪。嘉義基地的台電用電計畫書核准文件於會談時當面提供查驗。三個工作天內回覆。Leave your details and we will send the full site package for both sites (exact area and location, power approval status, timeline) and arrange a visit. The approved Taipower utility plan for the Chiayi site is presented for verification at the meeting. We reply within three business days.

✓核准文件當場查驗——會談時提供嘉義基地台電用電計畫書核准文件供貴司確認Verify the approval in person — we present the Chiayi site’s Taipower approval at the meeting
✓高鐵可達——鄰近高鐵嘉義站,桃園機場轉乘高鐵,高鐵車程約 1 小時多By HSR — near THSR Chiayi; from TPE Airport, transfer to the HSR for a ride of just over an hour
✓中英文接待——歡迎國際團隊實地評估Bilingual hosting — international teams welcome
送出後我們會直接收到;若傳送失敗,會改為開啟您的郵件程式。也可以直接來信 。Submitting sends your enquiry to us directly; if that fails, your mail client opens instead. You can also email us at .