嘉義・22.8kV 用電計畫書已核准・可即時供電、貨櫃式 AI 機櫃最快 1 個月內進場 | 路竹・161kV 特高壓申請中・即將可供電Chiayi · 22.8kV utility plan approved · power available now, containerised AI racks on site in as little as a month | Luzhu · 161kV EHV under application · power coming soon
找場地的人只需要這幾個數字。電力、進場與綠電都標明目前狀態;各基地頁有更多細節。The numbers a site-selection team screens on, with current status shown for power, move-in and renewables. More detail on each site page.
從鄰近嘉科台積電 AI 封裝廠的嘉義,到路竹科學園區,雙基地形成 AI 算力與綠能運輸的南部軸線。From Chiayi, near TSMC’s AI packaging fab, to Luzhu Science Park — a southern axis for AI compute and green logistics.
萬坪級。AIDC 示範基地與商辦規劃,鄰近高鐵嘉義站,定位為 AI 晶片出廠後的第一站。10,000+ ping. Planned AIDC demonstration site and offices near THSR Chiayi Station — the first stop after AI chips leave the fab.
萬坪級。特高壓申請中,具備超大規模算力集群潛力,大貨車停車與快充場域建置中。10,000+ ping. EHV supply under application, with hyperscale-cluster potential; truck parking and fast-charging area under construction.
在 AI 基礎設施市場,「有沒有台電核准的用電計畫書」是實幹與概念的分水嶺。我們選擇把證明攤開。In AI infrastructure, an approved utility plan is the line between real and conceptual. We choose to show ours.
場地合作模式(租地/代建/合資):依客戶需求規劃。以下兩類夥伴現階段開放洽談。Site engagement models (land lease / build-to-suit / JV): tailored to client needs. The two partner types below are open for discussion now.
嘉義第一期 3–6MW 液冷示範區規劃中,現階段開放預約進駐與 PoC 需求洽談。嘉義用電計畫書已核准,可據此規劃部署時程;需要更快上線者,可另採貨櫃式一站式 AI 機櫃,最快 1 個月內進場。The Phase-1 3–6MW liquid-cooled demo zone at Chiayi is in planning; we are taking reservations and PoC enquiries now. Chiayi's utility plan is approved, so deployment timing can be planned against it; for a faster go-live, turnkey containerised AI racks can be on site in as little as a month, as a separate option.
洽談進駐與 PoC →Discuss Hosting & PoC →已與散熱設備廠商建立合作,提供機櫃與散熱系統的選型與代購。800V 高壓直流架構聯合驗證與展示場域規劃中。Partnerships with cooling-equipment vendors are in place; we handle rack and cooling selection and procurement. An 800V HVDC joint-validation and showcase site is in planning.
技術合作洽談 →Discuss Tech Partnership →這是今天全球 AI 基礎設施最真實的瓶頸:硬體以月為單位演進,電力卻以年為單位核准。This is the real bottleneck of AI infrastructure today: hardware evolves in months, while power is approved in years.
特高壓用電須經台電區域電網衝擊評估,計畫書送審、變電設施建置一路走完,時間以年計。容量較小的案件通常較快,20MW 以下最快可在半年內取得。Extra-high-voltage service requires grid-impact review, plan approval, and substation build-out — measured in years. Smaller cases move faster: under 20MW can be secured in as little as six months.
新一代高功耗液冷機櫃陸續到貨,卻因場域電力未到位,只能在倉庫折舊;次世代更將走向 800V 高壓直流。New high-power liquid-cooled racks keep arriving — and keep depreciating in warehouses waiting for power; the next generation moves to 800V DC.
算力硬體的價值隨時間快速遞減。提早部署一年,就是多賺一輪算力財;晚一年,就是純損失。Compute hardware decays in value quickly. Deploying a year earlier means an extra cycle of revenue; a year later is pure loss.
AI 機櫃世代更替很快,一站式機櫃被視為下一步的趨勢;已經蓋好、或照舊規格規劃中的機房,可能得面對要不要改規格。我們的 AIDC 尚未動工,可以直接依最新規格規劃——還沒蓋,反而沒有包袱。AI rack generations turn over fast, and turnkey racks are widely seen as the next step; data halls already built, or planned to an older spec, may have to decide whether to re-specify. Our AIDC has not broken ground, so it can be planned to the latest spec from day one — nothing built yet, so nothing to retrofit.
不只是租給您一塊空間。從機櫃可用的電源規格、設備選型與採購,到把您的算力接上國際需求——我們把「在台灣部署 AI 算力」這件事的三段摩擦一次收斂。More than leased space. From rack-ready power specs to equipment sourcing to connecting your compute with global demand — we remove the three points of friction in deploying AI compute in Taiwan.
規劃提供高階算力機櫃所需的 800V 電源架構,讓次世代高功耗機櫃不必為了遷就舊機房電力上限而降規使用。We are planning the 800V power architecture high-end compute racks require — so next-gen racks need not be downgraded to fit an old hall’s power ceiling.
客戶只要決定要跑什麼算力。尚未確定規格時,我們先提供各型算力機櫃與散熱設備的型錄協助選型;需求確定後依實際需求報價,客戶下單並支付訂金後由我們代為採購,設備直接進駐本基地運轉。You decide what compute to run. If the specification is still open, we start with catalogues of rack and cooling options to help you choose; once the requirement is fixed we quote against it, procure on your behalf after the deposit, and the equipment goes straight into service at our site.
規劃協助進駐本基地的客戶對接國外算力需求方,讓機櫃裡的算力以實際使用量計費產生收入,而不是空轉等待。We plan to connect customers hosted at our sites with overseas compute demand, so the capacity in your racks can earn usage-based revenue instead of sitting idle.
鎖定嘉義高鐵・路科・南科・嘉科半導體供應鏈走廊。從員工電動車通勤到貨物運輸,建置可稽核的綠能運輸基礎設施;完成後將每月為國際企業產出無紙化 ESG 報告,支援 Scope 3 盤查與減量佐證。Aimed at the semiconductor supply-chain corridor around THSR Chiayi, Luzhu, Southern Taiwan Science Park (STSP) and Chiayi Science Park. From employee EV commuting to freight, we are building auditable green-mobility infrastructure; once complete it will issue paperless monthly ESG reports for multinational clients — supporting Scope 3 accounting and reduction evidence.
路科大貨車停車場域,月租、夜間停放與車隊調度。Monthly truck parking, overnight bays, and fleet staging at Luzhu.
建置中Under construction快充樁、離峰充電排程與 EMS 能源管理。Fast chargers, off-peak scheduling, and EMS energy management.
建置中Under construction太陽能停車棚發電,規劃完整記錄充電度數與用電流向。Solar canopies, with generation and charging flows to be fully recorded.
嘉義待併聯・路竹建置中Chiayi awaiting grid tie · Luzhu under construction鄰近科學園區大廠員工自駕電動小客車,於本場域充電;充電度數與通勤里程自動歸戶,直接對應 Scope 3 類別 7。平台介面已完成,尚待與充電樁硬體整合。Employees of nearby science-park manufacturers charge their own EVs on site; kWh and commute mileage are attributed automatically, mapping directly to Scope 3 Category 7. The platform interface is complete, pending integration with the charger hardware.
規劃中In planning
通勤與運輸資料每月自動彙整:車牌×充電度數×里程×排放係數。平台介面已完成,待與充電樁整合後開始供應;規劃每月固定將電子報告寄送至企業指定信箱,供 Scope 3 盤查引用。Commuting and freight data compiled monthly — number plate × kWh × mileage × emission factors. The platform interface is complete and will go live once charger integration is done; the electronic report is planned to be emailed to the client’s designated inbox on a fixed monthly cycle for Scope 3 reporting.
規劃中In planning
留下聯絡方式,我們提供兩基地的完整場址資料(精確面積與區位、電力核准狀態、時程),並安排實地參訪。嘉義基地的台電用電計畫書核准文件於會談時當面提供查驗。三個工作天內回覆。Leave your details and we will send the full site package for both sites (exact area and location, power approval status, timeline) and arrange a visit. The approved Taipower utility plan for the Chiayi site is presented for verification at the meeting. We reply within three business days.